UPDATES
Software
for
Architecture
,
Engineering
and
Construction
Home
|
CYPE
|
New features
|
Products
|
Store
|
Versions
|
Downloads
|
F.A.Q.
|
Contact
CYPE
>
english
>
new features
>
2019
>
CYPETHERM EPlus
New features of the 2019 version in CYPETHERM EPlus
The 2019 version of CYPETHERM EPlus incorporates the following new features.
INDEX
2019.a Version
Daikin heat pumps for hot water
Ventilation using the air conditioning system
Changes required to implement the ventilation using the air conditioning systems
Heat recovery in constant performance equipment
Outdoor air inlet in air-air conditioning systems such as rooftop and UTA unizona
New air conditioning systems: unizona and mutizona heat recoverers
Time with unsatisfied heating and cooling demand
2019.b Version
FUJITSU Airstage variable refrigerant flow (VRF) systems
Daikin water production VRV indoor units
Primary air conditioner
Toshiba 2018 equipment catalogue update
2019.d Version
Weather conditions to calculate the SPF of the heat pumps (Improvement of the analysis model of Daikin hot water systems)
Daikin Altherma Flex aerothermal system
3D view to complete screen
2019.e Version
Toshiba Estia Monobloc aerothermal system
Assistant to define air conditioning systems
Export to “CYPETHERM Improvements Plus”
Import “Open BIM TOSHIBA” equipment
Update to the 9.0 version of the EnergyPlus™ analysis engine
2019.f Version
Reduction in the analysis duration
Definition of mixed equipment for heating and DHW using an assistant
Estimate of the average seasonal performance of boilers for DHW production
Ventilation via air conditioning systems
Unknown adjacent spaces
Report of linear thermal bridges
Import Daikin Open BIM equipment
2019.g Version
Multiple editing of project elements
Open BIM workflow
Thermal envelope of the building in GLTF standard format
Export results to the Open BIM project
Import VRF equipment from Open BIM FUJITSU
Import data from Open BIM TOSHIBA
New CYPETHERM EPlus project examples
2019.h Version
Update of the EnergyPlus analysis engine to version 9.1
Increased compatibility of the air conditioning systems defined in the building
Margin of setpoint temperatures
Vaillant aerothermal systems
Saunier Duval aerothermal systems
Open BIM workflow
Import aerothermal equipment defined in Open BIM DAIKIN
More new features
More new features
New modules and programs
Architectural elements
Open BIM Suspended ceilings
(2019.a)
Open BIM Carpentry
(2019.b)
Open BIM Accessibility
(2019.b)
IFC Uploader
(2019.e)
Open BIM Electrical Mechanisms
(2019.e)
Open BIM RenoZEB – Focchi Facades
(2019.f)
Open BIM Residential Furniture
(2019.g)
Structural analysis
Post-tensioned waffle and joist floor slabs (CYPECAD module)
(2019.a)
StruBIM Anchors ACI 318
(2019.a)
Open BIM Health and safety
(2019.a)
Energy analysis
CYPETHERM Improvements Plus
(2019.e)
CYPETHERM FUJITSU
(2019.f)
MEP
CYPELEC Switchboard
(2019.a)
Open BIM Lightning
(2019.a)
CYPEFIRE FDS
(2019.e)
CYPEFIRE FDS Viewer
(2019.e)
HVAC
CYPEHVAC Schematics
(2019.a)
Open BIM TOSHIBA
(2019.e)
Open BIM POLYTHERM
(2019.e)
Open BIM ORKLI
(2019.e)
Open BIM FUJITSU
(2019.g)
CYPETHERM Radiant Floor
(2019.e)
Open BIM DAIKIN
CYPEHVAC Ductwork
EasyDuct
Infrastructures
Open BIM Water Supply
(2019.e)
Open BIM Sewage
(2019.e)
Open BIM Electrification
(2019.e)
Open BIM Gas Supply
(2019.e)
Bills of quantities
Open BIM Cost Estimator
(2019.d)
New features and improvements
Open BIM workflow
Improvements in code application
3D views in CYPE programs
IFC Builder
Open BIM Suspended ceilings
Open BIM Carpentry
Open BIM Water Equipment
Open BIM Accessibility
CYPE 3D
CYPECAD
Open BIM Health and safety
Continuous beams
StruBIM Anchors ACI 318
Infrastructures (Water supply, Sewage, Electrification and Gas supply)
CYPECAD MEP
CYPELEC Core
CYPELEC Multiline
CYPELEC Networks
CYPELEC Electrical Mechanisms
CYPETEL Wireless
CYPELUX
CYPEPLUMBING Sanitary Systems
CYPEPLUMBING Water Systems
CYPEPLUMBING Solar Systems
AcoubatBIM by CYPE
CYPEFIRE Design
CYPEFIRE Hydraulic Systems
CYPEHVAC Schematics
CYPEHVAC Radiant floor
CYPEHVAC Ductwork
CYPETHERM Improvements Plus
CYPETHERM LOADS
CYPETHERM EPlus
CYPETHERM HVAC
Open BIM DAIKIN
Open BIM TOSHIBA
Arquimedes and Job Control
Open BIM Cost Estimator
New features of the 2019 version (displayed per version)
2019.i Version
(28th June 2019)
2019.h Version
(23rd May 2019)
2019.g Version
(4th April 2019)
2019.f Version
(18th February 2019)
2019.e Version
(21st November 2018)
2019.d Version
(3rd October 2018)
2019.c Version
(10th August 2018)
2019.b Version
(3rd August 2018)
2019.a Version
(5th July 2018)
New features of the Previous versions
2018 version
2017 version
2016 version
2015 version
2014 version
2013 version
2012 version
©CYPE Ingenieros
- Av. de Loring, 4 - 03003 ALICANTE. Spain
Tel. USA (+1) 202 569 8902 // UK (+44) 20 3608 1448 // Spain (+34) 965 922 550 - Fax (+34) 965 124 950
Home
|
CYPE
|
Legal Aspects
|
Products
|
Versions
|
Downloads
|
Contact us
Bulgarian
|
French
|
Italian
|
Portuguese
|
Spanish
|
Spanish (Mexico)
|
Other dealerships